DIA LOGISTICS PARK
  • Home
  • Master Park Plan
  • North Parcel
  • South Parcel
  • Location

Building I

available  now for  immediate  fixturing!

Picture

 BUILDING  I 

625,000 SF Available
250,000 SF min. divisibility
40’ clear height
4 drive-in doors
288 auto parking;
+379 future
176 trailer parking;
+49 future
92 dock doors
60 dock positions
8" thick unreinforced slab
One 4,000-amp service
Vertical Divider

OCTOBER 2021   MOBILIZATION
MAY 2023   Fixturing
JUNE 2023   Building Completion
SEEKING LEED® CERTIFICATION

BUILDING 1 SPECULATIVE OFFICE PLAN

3,858  SF OFFICE    
MOVE- IN READY

Warehouse lighting to 30 foot candles
+49 future
92 dock doors
60 dock positions equipped with 40,000-lb mechanical levelers, bumpers and dock seals
Make-up air units for warehouse ventilation
Switchgear and tenant electrical panels for full 4,000-amp capacity
Picture

Latest  construction  photos - Q2 2023

Building II

Picture

Building  II 

1,028,000 SF Available
Building pad ready
40’ clear height
745 auto parking
502 trailer parking
176 docks
4 drive-in doors
8" thick unreinforced slab
Two 3,000-amp services
Vertical Divider

​​​OCTOBER 2021   Mobilization
​​​April 2022   pad complete
SEEKING LEED® CERTIFICATION

Picture
VIEW BROCHURE
Download Utility brochure

For Leasing Information:

MITCHELL H. ZATZ
Managing Director
303.217.7922
mitch.zatz@jll.com
CARMON HICKS, SIOR
Managing Director
​303.217.7975

carmon.hicks@jll.com
​JASON WHITE
Managing Director
303.390.5200

jason.white@jll.com
Picture
Picture
Although information has been obtained from sources deemed reliable, neither Owner nor JLL makes any guarantees, warranties or representations, express or implied, as to the completeness or accuracy as to the information contained herein. Any projections, opinions, assumptions or estimates used are for example only. There may be differences between projected and actual results, and those differences may be material. The Property may be withdrawn without notice. Neither Owner nor JLL accepts any liability for any loss or damage suffered by any party resulting from reliance on this information. If the recipient of this information has signed a confidentiality agreement regarding this matter, this information is subject to the terms of that agreement. ©2023. Jones Lang LaSalle IP, Inc. All rights reserved.
  • Home
  • Master Park Plan
  • North Parcel
  • South Parcel
  • Location